Regulations & Tariffs
Risk Management
Regulations & Tariffs

In order prevent workplace accidents and incidents, a Risk Management program has been put in place by FPCL to mitigate the risks and hazards that exist in every aspect of our operation.

Risk Management is the process of identifying the hazards, assessing the risks of these hazards, and then putting measures in place to minimise or eliminate the risk of these hazards.

Since the purchase of the PPE, pedestrian operated forklifts or walkie stacker will incur some costs and time for its implementation, the most timely and practicable control options is to develop a traffic management plan, demarcate areas for forklift and pedestrian movement and establish safe working procedures for forklift use in the workshop.

Risk Assessment Process

Identify the hazard

  1. Determine the consequence rating of the hazard
  2. Determine the likelihood rating of the hazard
  3. Using the risk matrix, find where the consequence rating meets with the likelihood rating on the risk matrix table, to get the overall risk rating.

Refer to the legend below the risk matrix to determine next course of action

Legend:

Low Risk- Acceptable risk and no further action required as long as risk has been minimised as much as possible

Medium Risk- Further action required to minimise risk       

High Risk- Unacceptable risk and further UGENT action required to minimise risk

Administrative and PPE Controls when used alone are the least preferred risk control method, as they rely on human behaviour and compliance to be effective, rather than physically controlling the risk.

Example:

Jone reports to his Supervisor that he witnessed a near miss incident in which an employee was nearly hit by a forklift in the workshop.

Consequence rating if hazard was to lead to harm: Major (A)
Likelihood of hazard leading to harm: Moderate (2)
Overall Risk Rating: A2= HIGH RISKIf we refer to the legend at the bottom of the risk matrix, a risk rating of high risk indicates that there is an unacceptable risk and urgent attention is required to minimize the risk.

If we refer to the legend at the bottom of the risk matrix, a risk rating of high risk indicates that there is an unacceptable risk and urgent attention is required to minimize the risk.

Now we have to determine which control will be effective to eliminate or minimise the risk.

  • Elimination- Discontinue the use of forklifts
  • Substitution- Replace forklifts with pedestrian operated forklifts or walkie stacker.
  • Engineering- Have a mechanic restrict the speed of forklifts
  • Administrative- Develop a traffic management plan; line marking the workshop for forklift and pedestrian areas; and establish safe working procedures for forklift use in the workshop area.
  • PPE- Purchasing high visibility work wear.

Proposed controls to be implemented:

Since the purchase of the PPE, pedestrian operated forklifts or walkie stacker will incur some costs and time for its implementation, the most timely and practicable control options is to develop a traffic management plan, demarcate areas for forklift and pedestrian movement and establish safe working procedures for forklift use in the workshop.